HomepageAbout HillsboroughCalendarCity GovernmentContact UsSite IndexSearch
IconHomepage > ... > Planning > Current Projects :: Nueva Master Plan Update ProjectE-mail storyPrint friendly format

Nueva Master Plan Update Project

The City Council adopted the last Nueva School Master Plan Update in 1996.  The key changes proposed from the 1996 Master Plan in the Nueva Master Plan Update include:
  • Request for an increase in enrollment from 400 to 500 students;
  • A net total of 23,240 square feet of additional building space to include a new middle school building, a new Environmental Center, new covered sports court, cafe expansion, new multi-purpose building, circulation and parking improvements and other smaller improvements.
The proposal spans a projected fifteen year time period.  It is also important to note that teh Nueva School Master Plan Update does not include the addition of a high school at the existing school site, 6565 Skyline Blvd., Hillsborough, CA.  The Nueva High School is located in San Mateo and is not associated with the current Hillsborough application.

The Nueva Master Plan Update proposal involves a request for a General Plan Amendment, Zoning Code Amendment, Permit to Operate Amendment, and environmental review due to the requested increase in enrollment beyond that permitted under the current General Plan and Zoning Code and the additional buildings proposed.  The potential key issues involve traffic and noise associated with an increase in use intensity.  While the impacts associated with the proposal may not reach a level of environmental significance as defined by the California Environmental Quality Act (CEQA), the Town will want to consider methods for offsetting potential community impacts.

The proposal received preliminary/conceptual review by the City Council in September 2012, the meeting minutes and associated materials of which are available below.

The proposal does not involve specific/design review of buildings but rather the school's strategic plan for the future.  The design and specifics of future new buildings will require separate consideration and approval.  The Nueva School submitted a formal application to the Town in early 2013 and environmental review is currently underway.  Documents pertinent to the formal application from the Nueva School are available via the links below and it is anticipated that the proposal will be formally reviewed by the City Council in the fall and winter months.

The Nueva School will be conducting independent public outreach to residents of the Town over the few months and Town Staff remains available to answer any questions you may have at (650) 375-7422 or via email at nmartin@hillsborough.net.

Public Notices:
Notice of Public Hearings & Notice of Intent to Adopt a Mitigated Negative Declaration_Nueva School Master Plan Update 

Draft Environmental Documents:
Draft Initial Study (IS) and Mitigated Negative Declaration (MND)
Appendices to Draft IS/MND

Formal Application Materials:
The Nueva School Master Plan Update Cover Letter
The Nueva School Master Plan Update Executive Summary
The Nueval School Master Plan Update Proposal
The Nueva School Master Plan Update - Supporting Documents 
Nueva School Outreach Letter to Hillsborough Residents 10-11-10

Preliminary/Conceptual Review Materials:
Nueva School Preliminary Review Proposal
The Nueva School Preliminary Review_Supporting Documents
The Nueva School Preliminary/Conceptual Review_Staff Presentation
September 2012 City Council Meeting Minutes

The Town of Hillsborough 1600 Floribunda Avenue, Hillsborough, CA 94010 (650) 375-7400
Copyright © 1997-2014 The Town of Hillsborough. All rights reserved.Powered by